hester bateman silver
A 1923 silver-lead ore discovery in Queensland, Australia, lead to the formation of Mount Isa Mines and the development of one of the world's great mines. By the 1960s, Mount Isa was the hub of a lead, zinc, silver and copper supply network, including smelting, refining and recycling facilities in Europe. In 1970, MIM Holdings succeeded Mount Isa Mines but, while diversifying in the 1970s and 1980s, management seemingly neglected Mount Isa. Revitalisation started in the late 1980s. The rising cost of processing Australian intermediates led MIM to withdraw first from copper and then lead-zinc smelting activities in Europe. These, plus improvements at MIM's coal operations, encouraged Xstrata to make an offer for the Group which took effect in mid-2003. Swiss-based and 40% owned by Glencore International, Xstrata has widespread ferroalloy, zinc and coal interests.
Today, the 320kmē Mount Isa lease encompasses not only the Isa operations but also the George Fisher mine. The ore mineralisation is stratiform, occurring in the 1,600 million-year-old Lower Proterozoic Urquhart Shale sequence. At Mount Isa, the sequence is 1km thick and dips at 65°. The orebodies lie within the upper 650m and are bounded by the Mount Isa fault on the west and by volcanic greenstones to the east. Comprising galena and sphalerite with pyrite and pyrrhotite, the lead-zinc-silver orebodies are concordant with carbonaceous dolomitic sediments, interfingering with the silica-dolomitic mass hosting copper. Over 20 ore zones are mineable, each up to 1.4km long by 800m deep and from 4m to 48m wide. As of mid-2003, the underground Isa lead mine had proved reserves of 2.8Mt grading 6.3% zinc, 5.5% lead and 150g/t silver, 3.3Mt of probable reserves with 5.4% Zn, 6.3% Pb and 180g/t Ag, and measured-plus-indicated resources of 15.8Mt with approximately 6% Zn, 7% Pb and 190g/t Ag. Xstrata has feasibility studies in progress for an open-pit mine where indicated-plus-inferred resources total 287Mt and grade 4.2% Zn, 3.2% Pb and 74g/t Ag.
The Isa mine, concentrator and crude lead-smelting operation started in 1931. Today's lead mine has one 1,144m-deep shaft (R62) providing the main service access to nine levels between 611m and 1,076m below surface and skip ore hoisting from the crushing system on Level 20. Two rail systems, one on Level 15 and the other on Level 19, dump ore and waste to the crushing station. Level 19 trains also haul from the X41 copper mine to crushing stations at the base of the U62 hoisting shaft. In 2002, MIM installed a Micromine mine control system. Large stable sections are open-stoped from sub-levels; below, weaker parts of the hanging wall slices up to 12m wide and 250m long are mined by bench stoping, which replaced cut-and-fill in the early 1990s, reducing costs and increasing productivity. MIM invested in flexible mobile equipment from competing suppliers and introduced centralised tele-remote ore loading. Various fill formulations based on combinations of process wastes, rock and cement, stabilise the voids.
The present lead mine concentrator was built in 1966 with rod and ball milling, lead-silver flotation, zinc flotation and low-grade middlings recovery circuits. In 1982, MIM added heavy-medium separation to pre-concentrate the mill feed. Later enhancements have included column cell flotation. To process the George Fisher ores, Isa increased the plant's capacity to 2.5Mt/y in mid-2000, adding ISAmills for ultra-fine regrinding and improving the cleaner flotation and thickener operations to increase the recoveries, concentrate grades and throughput. A blast furnace converts sintered lead-silver concentrate to lead-silver bullion for subsequent refining at the Northfleet refinery in the UK. Zinc concentrates are currently exported and low-grade middling concentrates go mainly to Imperial Smelting Process plants.
|